The following schedule was prepared by the production manager of Marymount Metal Shop: CUTTING Job S

The following schedule was prepared by the production manager of Marymount Metal Shop: CUTTING Job Start Finish A POLISHING Start Finish B 11 13 15 C D E F G 11 15 17 20 24 Determine a schedule that will result in earliest completion of all jobs on this list. The sequence is (Click to select C-G-A-B-D-E-F A-B-C-D-E-F-G D-G-E-F-A-B-C F-A-C-B-D-G-E E-G-F-A-B-C-D G-A-E-D-B-C-F B-C-A-D-F-E-G

 